Railway PSU Projects

Navratna PSU (unspecified, likely IRCON or RITES) secured ₹200 crore project, fuelling 26% stock surge in five sessions.Tied to Electric Power System Strengthening (EPSS) for grid reliability, with 18-month execution boosting order book to ₹450 crore. Changing trend: PSU railways pivot to renewables-integrated infra.

Send Feedback

 
More Bureaucracy News
Load more